Laser machining device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10741988
APP PUB NO 20180301862A1
SERIAL NO

15943901

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laser machining device capable of recovering an exhaust performance of a dry pump easily is provided. A laser machining device includes: an oscillating portion that generates a machining laser beam G; an enclosure portion in which a first gas is enclosed; and an exhausting portion that exhausts the first gas together with a dirt generated in the enclosure portion in association with an operation of the oscillating portion. The exhausting portion includes: a dry pump; a first line that connects the enclosure portion and the dry pump; a second line that supplies a second gas having a higher pressure than the first gas to the dry pump; a valve portion that opens or closes the first line and the second line; and a control unit that controls opening or closing of the valve portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FANUC CORPORATION3580 SHIBOKUSA AZA-KOMANBA OSHINO-MURA MINAMITSURU-GUN YAMANASHI 401-0597

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oota, Kazuya Yamanashi, JP 59 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00