Mounting clamp device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10718365
APP PUB NO 20180298929A1
SERIAL NO

15735580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clamp device (100) for mounting equipment to a support structure (200) including a base (105) and a slider (110). The base (105) includes a first trough (155) formed in the front side (140) of the base (105) and a second trough (160) formed in the back side (145) of the base (105) and a first coupling element located on the first lateral side (130) and a second coupling element located on the second lateral side (135) of the base (105). Each of the first and second coupling elements extend from near the top end (120) of the base (105) towards the bottom end (125) of the base (105) at an angle relative to the first trough (155). The slider (110) includes a channel (185) on a back side (145) of the slider (110) and corresponding coupling elements within the channel (185) configured to slidingly engage the first and second coupling elements upon association of the slider (110) with the base (105).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DRÄGERWERK AG & CO KGAAMOISLINGER ALLEE 53-55 LÜBECK 23558

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Collins, Ashleigh C Derry, US 4 9
Lund, Peter Andrew Nashua, US 14 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 21, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00