Method of manufacturing a composite sandwich panel for an aircraft propulsion unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10239227
APP PUB NO 20180290330A1
SERIAL NO

16008208

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a method of manufacturing a composite sandwich panel having a core formed of a plurality of cells extending vertically between a first skin and a second skin. The method includes creating at least one first strip and a second strip from a temporary material, each strip having at least one cavity having a succession of aligned half-cells, lining the cavity of the first strip with a fibrous ply, assembling the first strip and the second strip by interlocking the cavity of the first strip with the cavity of the second strip and trapping the fibrous ply therebetween, and trimming excess temporary material of the entirety of the strips formed during the preceding assembly step so as to form a new cavity which forms a succession of aligned half-cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLES76700 GONFREVILLE-L'ORCHER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caruel, Pierre Gonfreville l'Orcher, FR 56 343
Hurlin, Hervé Gonfreville l'Orcher, FR 9 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00