Air conditioning device, ejector used therein, and method for controlling air conditioning device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11573035
APP PUB NO 20180274821A1
SERIAL NO

15763249

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioning device includes a plurality of ejectors which have a refrigerant circuit including a compressor, a condenser and an evaporator, are connected in parallel to the refrigerant circuit, and are formed so as to each have a different maximum refrigerant flow, and a control unit which, according to a driving condition of the air conditioning device, controls so that the refrigerant flows to one ejector among the plurality of ejectors, and the refrigerant does not flow to the rest of the ejectors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Yong-taek Suwon-si, KR 2 11
Jeong, Hee-moon Yongin-si, KR 31 420
Kil, Seong-ho Seongnam-si, KR 2 12
Kim, Bo-heum Suwon-si, KR 1 10
Kim, Seok-uk Hwaseong-si, KR 1 10
Kim, Sun-soo Suwon-si, KR 5 38
Lee, You-seop Yongin-si, KR 25 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00