Metal powder for powder metallurgy, compound, granulated powder, sintered body, and ornament

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11498123
APP PUB NO 20180264547A1
SERIAL NO

15542294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal powder for powder metallurgy contains Co as a principal component, Cr at 16 mass % or more and 35 mass % or less, and Si at 0.3 mass % or more and 2.0 mass % or less, wherein when one element selected from Ti, V, Y, Zr, Nb, Hf, and Ta is a first element, and one element selected from the group and having a higher group number in the periodic table than that of the first element or having the same group number in the periodic table as that of the first element and a higher period number than that of the first element is a second element, the first element is at 0.01 mass % or more and 0.5 mass % or less, and the second element is at 0.01 mass % or more and 0.5 mass % or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATION1-6 SHINJUKU 4-CHOME SHINJUKU-KU TOKYO 160-8801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Hidefumi Hachinohe, JP 52 169
Tamura, Takayuki Hachinohe, JP 100 1159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00