Interconnection board of a stator for an electrical machine and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10686344
APP PUB NO 20180262075A1
SERIAL NO

15542139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An interconnection board (52) of a stator (10) of an electrical machine (12), as well as a method for producing same, by means of which an electrical winding (16) of the stator (10) can be connected to customer-specific connecting plugs (56) for power supply, wherein the interconnection board (52) has a closed ring (61) as a plastic body (62), onto which closed ring (61) exactly three holding elements (63) are integrally formed, extending in the axial direction (3), in which holding elements respective axial connector plugs (54) made of metal extend in the axial direction, wherein the axial connector plugs (54) are each integrally configured with conductive elements (58) which can be directly electrically connected to connecting wires (30, 31) of the electrical winding (16).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Csoti, Tamas Kisszallas, HU 3 27
Haberkorn, Konstantin Stuttgart, DE 8 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00