Electrode material and method for manufacturing electrode material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361039
APP PUB NO 20180240612A1
SERIAL NO

15751595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is an electrode material that is used as an electrode contact of a vacuum interrupter and that contains one or more parts by weight of a heat-resistant element and one part by weight of Cr, the remainder being Cu and an unavoidable impurity. A part of Cr powder and the heat-resistant element powder are mixed together, and this mixed powder is sintered such that a peak corresponding to Cr element disappears in X-ray diffraction measurement. A solid solution powder obtained by pulverizing a sintered body of the heat-resistant element and Cr obtained by the sintering is mixed with the remaining Cr powder, and this mixed powder is shaped and then sintered. A sintered body obtained by this sintering is infiltrated with Cu.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEIDENSHA CORPORATION1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6029

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuhata, Takaaki Shizuoka, JP 6 22
Hasegawa, Kosuke Numazu, JP 42 182
Hayashi, Shota Tokyo, JP 30 32
Ishikawa, Keita Tokyo, JP 35 110
Yamamura, Kenta Numazu, JP 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00