Method for manufacturing silicon carbide epitaxial substrate, method for manufacturing silicon carbide semiconductor device, and apparatus for manufacturing silicon carbide epitaxial substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697086
APP PUB NO 20180237942A1
SERIAL NO

15752985

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In forming of a silicon carbide layer, when an X axis indicates a first value representing, in percentage, a value obtained by dividing a flow rate of silane by a flow rate of hydrogen and a Y axis indicates a second value representing a flow rate of ammonia in sccm, the first value and the second value fall within a quadrangular region surrounded by first coordinates, second coordinates, third coordinates, and fourth coordinates in XY plane coordinates. The first coordinates are (0.05, 6.5×10−4). The second coordinates are (0.05, 4.5×10−3). The third coordinates are (0.22, 1.2×10−2). The fourth coordinates are (0.22, 1.3×10−1). After the forming of the silicon carbide layer, an average value of carrier concentration of the silicon carbide layer is more than or equal to 1×1015 cm−3 and less than or equal to 2×1016 cm−3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO ELECTRIC INDUSTRIES LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Hideyuki Itami, JP 18 98
Itoh, Hironori Itami, JP 19 94
Wada, Keiji Itami, JP 162 865

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00