Electromagnetic lifter for hot materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10167174
APP PUB NO 20180237272A1
SERIAL NO

15314356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electromagnetic lifter for moving hot materials includes a ferromagnetic yoke formed by a horizontal core and two vertical polarities, coils wound around the core and enclosed in a container, a non-magnetic baffle arranged between the vertical polarities and below the container at a distance of at least 40 mm to protect the container from heat radiated by the hot material. The electromagnetic lifter also includes a first space between the container and the plurality of vertical polarities that maintains a first predetermined distance between the container and the plurality of vertical polarities, a second space between the container and the core that maintains a second predetermined distance between the container and the core, and a third space between the container and the non-magnetic baffle that allows a convective flow of air. The electromagnetic lifter also includes side spacers disposed in the first space and top spacers disposed in the second space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SGM MAGNETICS S P A25025 MANERBIO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Molteni, Danilo Manerbio, IT 17 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00