Artificial blood vessel, method for producing artificial blood vessel, and method for producing porous tissue regeneration substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10463469
APP PUB NO 20180221132A1
SERIAL NO

15747815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention aims to provide a method for producing a porous tissue regeneration substrate that allows a wide choice of solvents and easy adjustment of the bulk density and pore size of the porous substrate. The present invention also aims to provide a method for producing an artificial blood vessel and an artificial blood vessel. The present invention relates a porous, tubular artificial blood vessel containing a bioabsorbable material, the artificial blood vessel including: a skin layer having a relatively small pore size as an innermost layer; and a porous layer positioned around the skin layer and having a relatively large pore size.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUNZE LIMITED1 ZEZE AONO-CHO AYABE-SHI KYOTO 623-8511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurobe, Hirotsugu Tokushima, JP 3 4
Nakayama, Hidetaka Kyoto, JP 16 144
Sawai, Kosuke Shiga, JP 2 3
Shinoka, Toshiharu Tokyo, JP 6 17
Tara, Shuhei Tokyo, JP 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00