Image forming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10437184
APP PUB NO 20180217535A1
SERIAL NO

15875450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An image forming apparatus includes a developing section, a transfer section, and a fixing section. The developing section attaches a metal-containing toner to a latent image, and attaches a non-metal-containing toner to the latent image. The transfer section transfers, onto an intermediate transfer medium, the metal-containing toner and transfers, onto a print medium, the metal-containing toner. The transfer section transfers, onto the intermediate transfer medium, the non-metal-containing toner and transfers, onto the print medium, the non-metal-containing toner. The fixing section fixes, to the print medium, the metal-containing toner, and fixes, to the print medium, the non-metal-containing toner. The fixing section causes a temperature at which the metal-containing toner is fixed to the print medium to be lower than a temperature at which the non-metal-containing toner is fixed to the print medium.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OKI DATA CORPORATION11-22 SHIBAURA 4-CHOME MINATO-KU TOKYO 108

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koido, Kenji Tokyo, JP 23 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00