Composite aircraft manufacturing tooling and methods using articulating mandrels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10744724
APP PUB NO 20180201009A1
SERIAL NO

15924116

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Composite tooling systems and methods of manufacturing composite stringers of aircraft are provided herein. A composite tooling system includes a layup tool and an articulating stringer mandrel. The layup tool has a contoured surface with portions having different surface complexities. The articulating stringer mandrel includes two rigid mandrel elements and a cable. The first rigid mandrel element defines a first aperture, a first stringer surface, and a first bottom surface. The second rigid mandrel element is adjacent to the first rigid mandrel element and defines a second aperture, a second stringer surface, and a second bottom surface. A first length of the first rigid mandrel element cooperates with the surface complexity and a second length of the second rigid mandrel element cooperates with the surface complexity at the second rigid mandrel element so that a gap between the rigid mandrel elements does not exceed a predetermined gap threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GULFSTREAM AEROSPACE CORPORATIONP O BOX 2206 M/S B-06 SAVANNAH GA 31402

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grieco, James R Savannah, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00