Partitioned surgical instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11007000
APP PUB NO 20180185084A1
SERIAL NO

15911338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surgical instrument includes a reusable component and a disposable component selectively separable from and engagable with the reusable component. The disposable component includes an end effector and a mechanical actuator operable to induce mechanical movement of the end effector. The reusable component is configured for providing electrosurgical energy to the disposable component when engaged with the disposable component. A physical mating feature is configured to maintain engagement between the reusable and disposable components when the reusable and disposable components are engaged, and an electrical mating feature is configured to transmit electrical energy between the disposable and reusable components when the disposable and reusable components are engaged. All mechanical motion resulting from operation of the mechanical actuator may be contained within the disposable component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVIDIEN LP15 HAMPSHIRE STREET MANSFIELD MA 02048

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deborski, Christopher A Denver, US 20 538
Hart, Keir Lafayette, US 78 4954
Hempstead, Russell D Lafayette, US 61 7063

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00