Method for producing electrode material and electrode material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10153098
APP PUB NO 20180174771A1
SERIAL NO

15570433

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is a method for producing an electrode material containing Cu, Cr and a heat-resistant element. A heat-resistant element powder and a Cr powder are mixed together such that the heat-resistant element is less than the Cr by weight. A resulting mixed powder is baked. A resulting sintered body containing a solid solution of the heat-resistant element and the Cr is pulverized, and a resulting solid solution powder is classified, to have a particle size of 200 μm or less. 10-60 parts by weight of the classified solid solution powder and 90-40 parts by weight of a Cu powder are mixed together, followed by sintering to obtain the electrode material. If a low melting metal powder having a median size of 5-40 μm is mixed with a mixed powder of the solid solution powder and the Cu powder, the deposition resistance property is further improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEIDENSHA CORPORATION1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6029

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuhata, Takaaki Shizuoka, JP 6 22
Hasegawa, Kosuke Numazu, JP 42 182
Hayashi, Shota Tokyo, JP 30 32
Ishikawa, Keita Tokyo, JP 35 110
Yamamura, Kenta Numazu, JP 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00