Hybrid resonator and amplifier combination for generating high energy output signal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10079468
APP PUB NO 20180166848A1
SERIAL NO

15374153

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid resonator and amplifier combination for generating a high energy output signal. The combination comprises a beam splitter for splitting a pump laser beam into first and second portions. The second portion beam being conveyed to a resonator which operates in a single transverse mode to generating a signal wavelength beam. An output coupler of the resonator allows a first portion of the signal wavelength beam to pass therethrough while retaining a second portion of the signal wavelength beam within the resonator. A system dichroic mirror receives and directs both the first portion and the signal wavelength beam toward an amplifier. The amplifier receives both the first portion and the signal wavelength beam. The first portion, upon passing through the amplifier, creates gain which is used by the amplifier to amplify the signal wavelength beam generate the high energy output signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INCPO BOX 868 NASHUA NH 03061-0868

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCarthy, John C Hampton, US 16 91
Snell, Katherine J Nashua, US 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00