Peak current evaluation system and peak current evaluation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10281501
APP PUB NO 20180164349A1
SERIAL NO

15628393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A peak current evaluation apparatus for an IC is provided. The peak current evaluation apparatus includes a pulse tuner and a testing circuit. The pulse tuner receives a clock signal, adjusts pulse width and duty ratio of the clock signal according to at least one predetermined parameter in order to generate a pulse signal with a stress voltage. The testing circuit is coupled to the pulse tuner. The testing circuit, which includes two input ports, receives the pulse signal at one of the two input ports in order to stress a testing device, measures the resistance value of the testing device, and calculates the peak current of the testing device when the resistance value increases and exceeds a threshold value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD8 LI-HSIN RD 6 HSINCHU SCIENCE PARK HSINCHU 300-78

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Wen-Shen Zhubei, TW 73 297
Peng, Yung-Chow Hsinchu, TW 205 737
Yang, Yu-Tao Zhubei, TW 32 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00