Power transmission apparatus of hybrid electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10343671
APP PUB NO 20180162346A1
SERIAL NO

15638033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power transmission apparatus for a hybrid vehicle may include a planetary gear set as a torque branching device disposed on the same axis with the engine; and a final reduction device having a final reduction gear receiving a torque of the engine and a torque of the second motor/generator, wherein, the torque of the engine is delivered to the final reduction gear through the planetary gear set, an intermediate shaft, and an output gear formed on an output shaft, and the torque of the second motor/generator is delivered to the final reduction gear through a shifting device facilitating multi-stages of torque transmission.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Chulmin Busan, KR 30 96
Byun, SungGon Anyang-si, KR 23 75
Ha, Junyoung Ulsan, KR 13 21
Kim, Baekyu Hwaseong-si, KR 46 306
Kim, Seok Joon Yongin-si, KR 48 287

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00