Process for the continuous polymerization of a diene elastomer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10822445
APP PUB NO 20180134830A1
SERIAL NO

15735406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the continuous synthesis of a diene elastomer by n reactors r1 to rn, n ranging from 2 to 15, is provided. The reactor r1 is fed by an input solution comprising a solvent, one or more monomers, an anionic polymerization initiator and a polar agent, one or more of the reactor(s) r2 to rn also being fed by reinjection of a purified solution comprising solvent and/or monomer(s), the purity of the or of each reinjected solution being such that the proportion of the number of dead chains in the output stream from the reactor rn is less than 30%, of the number of living chains initiated in the reactor r1, the temperature of each reactor ranging from 20 to 150° C. and being greater than or equal to the temperature of the reactor which immediately precedes it, the diene elastomer having a polydispersity index of 1.1 to 2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN63000 CLERMONT-FERRAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dorato, Margarita Clermont-Ferrand, FR 14 35
Flesinski, Lionel Clermont-Ferrand, FR 2 4
Kiener, Pierre Clermont-Ferrand, FR 8 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00