Component mounter and mounting board manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10813227
APP PUB NO 20180132359A1
SERIAL NO

15785732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a component press-bonding device that performs work related to component mounting on a board after a mark provided on a transparent end region of the board is recognized, an imaging camera provided with an imaging optical axis extending downwards, a light emitter that irradiates the end region with illumination light from above the board in a state where the mark is positioned within an imaging visual field of the imaging camera, and a light reflecting member that is provided below the imaging camera and reflects the illumination light, which is emitted by the light emitter and is transmitted downwards through the end region, back to the end region are included. The imaging camera images the mark under the illumination light, which is reflected by the light reflecting member and is transmitted upwards through the end region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kameda, Akira Osaka, JP 10 25
Tsujikawa, Toshihiko Osaka, JP 22 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00