Shielding material for shielding radioactive ray and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10636534
APP PUB NO 20180114605A1
SERIAL NO

15826998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shielding material for shielding radioactive ray and preparation method thereof. The shielding material consists of water, a cementing material, a fine aggregate material, a coarse aggregate material and an additive, wherein the fine aggregate material consists of a borosilicate glass powder and a barite sand, and the coarse aggregate material consists of a barite. A content of boron element in the borosilicate glass powder accounts for 0.5%-1% of the total weight of the shielding material. A content of barium sulfate in the barite sand and the barite accounts for 71%-75% of the total weight of the shielding material. Other contents include water, the cementing material and the additive, and a sum of contents of all components is 100% total weight of the shielding material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEUBORON MEDTECH LTDNANJING JIANGSU 211112

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Ming-Chuan Jiangsu, CN 9 53
Chen, Wei-Lin Jiangsu, CN 85 175
Liu, Yuan-Hao Jiangsu, CN 51 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00