Fuel supply system for turbine engines and methods of assembling same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10012388
SERIAL NO

15333964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel supply system includes a first fuel supply line coupled in flow communication with a first fuel nozzle and configured to channel a first fuel flow to the first nozzle. A second fuel supply line coupled in flow communication with a second fuel nozzle and configured to channel a second fuel flow to the second nozzle. A water supply line coupled in flow communication with a water injection nozzle and configured to channel a water flow to the water injection nozzle. An atomizing fluid supply circuit coupled in flow communication with the first and second fuel supply lines. The atomizing fluid supply circuit configured to channel an atomizing fluid flow to an atomizing nozzle and into atomizing contact with the water flow. The atomizing fluid includes a portion of at least one of the first fuel flow and the second fuel flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON RD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Saha, Rajarshi Karnataka, IN 32 402
Todeti, Sudhakar Karnataka, IN 7 133

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00