Systems and methods for producing flat surfaces in interconnect structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10804151
APP PUB NO 20180102286A1
SERIAL NO

15834354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In interconnect fabrication (e.g. a damascene process), a barrier layer (possibly conductive) is formed over a substrate with holes, a conductor is formed over the barrier layer, and the conductor and the barrier layer are polished to expose the substrate around the holes and provide interconnect features in the holes. To prevent erosion/dishing of the conductor over the holes, the conductor is covered by another, “first” layer before polishing; then the first layer, the conductor, and the barrier layer are polished to expose the substrate. The first layer may or may not be conductive. The first layer protects the conductor to reduce or eliminate the conductor erosion/dishing over the holes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TESSERA INC3025 ORCHARD PARKWAY SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mohammed, Ilyas Santa Clara, US 319 8544
Oganesian, Vage Palo Alto, US 149 6013
Uzoh, Cyprian Emeka San Jose, US 382 12692

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00