System and method for finishing the surface of three-dimensional (3D) objects formed by additive manufacturing systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10625292
APP PUB NO 20180099300A1
SERIAL NO

15290674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system treats uneven surfaces of additive manufactured objects to improve the transparency and glossiness of the surfaces. The system operates a sprayer to apply fluid material used to form the uneven surface to the uneven surface to smooth the surface or the system operates an actuator to dip the additive manufactured object into a bath of fluid material that is the same as the material used to form the uneven surface to smooth the surface. A heater is provided to dry non-UV curable material applied to the uneven surface and a source of UV radiation is provided to cure UV curable material applied to the uneven surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XEROX CORPORATION201 MERRITT 7 P O BOX 4505 NORWALK CT 06851-1056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dufort, Ron E Rochester, US 29 78
Hoover, Linn C Webster, US 139 985
Kanungo, Mandakini Penfield, US 113 781
Ruiz, Erwin Rochester, US 117 312

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00