Systems and methods for regulating power conversion systems with output detection and synchronized rectifying mechanisms

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10622903
APP PUB NO 20180076720A1
SERIAL NO

15719283

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System controller and method for regulating a power converter. For example, the system controller includes a first controller terminal and a second controller terminal. The system controller is configured to receive an input signal at the first controller terminal and generate a drive signal at the second controller terminal based at least in part on the input signal to turn on or off a transistor in order to affect a current associated with a secondary winding of the power converter. Additionally, the system controller is further configured to determine whether the input signal remains larger than a first threshold for a first time period that is equal to or longer than a first predetermined duration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ON-BRIGHT ELECTRONICS (SHANGHAI) CO LTD201203 BUILDING 3 BUSINESS CENTER 168 HUATUO ROAD ZHANGJIANG HIGH TECH PARK PUDONG NEW AREA SHANGHAI SHANGHAI CITY SHANGHAI CITY 201203

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Yaming Shanghai, CN 40 1685
Fang, Lieyi Shanghai, CN 341 10839
Lin, Yuan Shanghai, CN 233 3409
Luo, Qiang Shanghai, CN 122 1471

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00