Automated re-melt control systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10634284
APP PUB NO 20180073685A1
SERIAL NO

15701383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system may automatically control a pipeline heating system to maintain a desired temperature and/or to provide flow assurance of process fluid along a pipeline. The system may identify the occurrence and location of the solidification of a given process fluid or the melting of the given process fluid by monitoring temperatures along the pipeline and identifying from the monitored temperatures the occurrence and location of a latent heat signature associated with the solidification or melting of the given process fluid. The system may determine a distribution of solidified process fluid along the pipeline. The system may determine the percentage of a given section of pipeline that is filled with solid and/or liquid process fluid on a meter-by-meter basis. The system may perform automated re-melt operations to resolve plugs of solidified process fluid that may occur in the pipeline.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NVENT SERVICES GMBHFREIER PLATZ 10 SCHAFFHAUSEN 8200

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allenspach, Mike Sugar Land, US 4 2
Chakkalakal, Franco A Manvel, US 3 1
Kalar, Kent Austin, US 13 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00