Propellant injector allowing propellant to be discharged while ensuring uniform injection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10655565
APP PUB NO 20180073465A1
SERIAL NO

15554464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An injector of a propellant combustion member, the injector including a first feed and a second feed; the first feed being connected to a plurality of feed chimneys arranged around a longitudinal axis; the second feed being configured so as to feed an injection chamber; and the injection chamber being connected to a plurality of feed sheaths with injection orifices, each feed chimney being surrounded by a coaxial feed sheath; the injector including a takeoff chamber connected to a takeoff duct for taking off the second propellant, the takeoff chamber being arranged in such a manner as to take off the second liquid propellant from the injection chamber; and it is configured to achieve uniform injection of the second propellant via the injection orifices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ARIANEGROUP SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cruz, Carlos Gaillon, FR 5 23
Delahaye, Olivier Oissel, FR 3 5
Guichard, Didier Menilles, FR 10 14
Humbert, Erwan Bois-Jerome Saint-Ouen, FR 1 0
Le, Cras Jean-Luc Saint-Marcel, FR 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00