Method for producing cellulose filaments with less refining energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10683612
APP PUB NO 20180073194A1
SERIAL NO

15703048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel method is disclosed to make cellulose filaments (CF) from wood or other plant fibers with lower energy consumption. The method consists of multi-stage, high consistency refining, followed by low consistency refining or by low consistency, non-refining mechanical treatment, of wood or other plant fibers. The total specific refining energy for the multi-stage, high consistency refining is preferably 2,000-18,000 kWh/t, and more preferably 2,000-12,000 kWh/t. The CF produced can be used as a superior reinforcement additive in the production of paper, tissue or paperboard and in the production of plastic composites. It can also be used as a viscosity or rheology modifier in food products, coatings or drilling muds. The CF produced can also be used to make strong films for application in packaging and in composites.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FPINNOVATIONSPOINTE-CLAIRE QUÉBEC H9R 3J9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Yuxia Kirkland, CA 7 72
Hu, Thomas Vancouver, CA 3 4
Hua, Xujun Kirkland, CA 9 279
Neault, Patrick Les Coteaux, CA 3 47
Njamen, Tchapda Guy Roger Montreal, CA 1 4
Owston, Tom Les Cèdres, CA 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00