Aluminum alloy pipe with superior corrosion resistance and processability, and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10889881
APP PUB NO 20180073119A1
SERIAL NO

15563694

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aluminum alloy pipe produced by porthole extrusion includes: Mg at a concentration equal to or higher than 0.7% (mass %, the same applies hereinafter) and lower than 1.5%; Ti at a concentration higher than 0% and equal to or lower than 0.15%; with the balance being Al and unavoidable impurities. As the unavoidable impurities, Si has a limited concentration of 0.20% or lower, Fe 0.20% or lower, Cu 0.05% or lower, Mn 0.10% or lower, Cr 0.10% or lower, and Zn 0.10% or lower. Difference between the maximum value and the minimum value of the Mg concentration in a lengthwise direction of the pipe is 0.2% or lower, and the average crystal grain size in a cross-section perpendicular to the lengthwise direction is 300 μm or smaller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UACJ CORPORATION1-7-2 OTEMACHI CHIYODA-KU TOKYO 1000004 ?1000004
UACJ EXTRUSION CORPORATIONTOKYO 103-0026

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatta, Hidenori Tokyo, JP 9 27
Ishizaka, Takumi Nagoya, JP 3 15
Suzuki, Taichi Tokyo, JP 28 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00