Method for making metal-carbon composites and compositions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10662509
APP PUB NO 20180073110A1
SERIAL NO

15261205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making covetic metal-carbon composites or compositions by electron beam melt heating under vacuum (pressure <10−3 Torr) is described herein. This fabrication method is advantageous, in that it provides oxygen-free covetic materials in a process that allows precise control of the composition of the covetic material to be produced. The method described herein also can be applied to produce multi-element-carbon composites within a metal or alloy matrix, including high melting temperature materials such as ceramic particles or prefabricated nano- or micro-structures, such as carbon nanotubes or graphene compounds. The covetic reaction between metal and carbon takes place under the influence of flowing electrons through the melted metal-carbon precursor. This process creates strong bonding between nanocarbon structure and the metal elements in the melt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UCHICAGO ARGONNE LLC5801 SOUTH ELLIS AVENUE CHICAGO IL 60637

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balachandran, Uthamalingam Willowbrook, US 58 497
Dorris, Stephen E Lagrange Park, US 24 170
Ma, Beihai Naperville, US 22 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00