Reciprocating saw blade

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10722961
APP PUB NO 20180071847A1
SERIAL NO

15817766

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A saw blade for use with a reciprocating saw includes a body and an attachment portion extending from the body. The attachment portion includes a tang and an aperture configured to connect to the reciprocating saw. The saw blade also includes a cutting portion formed on the body. The cutting portion includes a plurality of cutting teeth, and first and second floor guard teeth spaced apart and positioned adjacent at least one of the plurality of cutting teeth. Each cutting tooth has a tip that defines a plane. The body has a first height measured generally perpendicularly from a back edge of the body to the plane. The attachment portion has a second height measured generally perpendicular to the plane. A ratio of the first height to the second height is between approximately 4 and approximately 5. The first and second floor guard teeth extend beyond the plane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MILWAUKEE ELECTRIC TOOL CORPORATION13135 WEST LISBON ROAD BROOKFIELD WI 53005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Butzen, Robert W Colgate, US 42 574
Kazda, Austin J Wauwatosa, US 47 481
Schulz, Andrew J Slinger, US 29 349

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 28, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00