Molten fuel nuclear reactor with neutron reflecting coolant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10867710
APP PUB NO 20180068750A1
SERIAL NO

15783895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Configurations of molten fuel salt reactors are described that utilize neutron-reflecting coolants or a combination of primary salt coolants and secondary neutron-reflecting coolants. Further configurations are described that circulate liquid neutron-reflecting material around a reactor core to control the neutronics of the reactor. Furthermore, configurations which use the circulating neutron-reflecting material to actively cool the containment vessel are also described. A further configuration is described that utilizes a core barrel between a reactor core volume of molten fuel salt and a reflector volume, in which the reflector volume contains a plurality of individual reflector elements separated by an interstitial space filled with molten fuel salt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERRAPOWER LLC15800 NORTHUP WAY BELLEVUE WA 98008

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cisneros,, Jr Anselmo T Seattle, US 23 361
Freeman, Charles Gregory Kirkland, US 14 194
Kramer, Kevin Redmond, US 25 331
Latkowski, Jeffery F Mercer Island, US 22 417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00