Non-oriented electrical steel sheet, production method therefor, and motor core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10941458
APP PUB NO 20180066333A1
SERIAL NO

15551849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the production of a non-oriented electrical stress sheet by hot rolling a slab having a chemical composition comprising, by mass %, C: not more than 0.005, Si: 1.5-6.0, Mn: 0.05-2.0 and P: 0.03-0.15, subjecting to a hot band annealing, if necessary, cold rolling, finish annealing, and forming an insulation coating, the cooling from 700° C. to 500° C. in the finish annealing is conducted in an oxidizing atmosphere with an oxygen potential PH2O/PH2 of not less than 0.001 for 1-300 seconds, whereby P is segregated into the surface of the steel sheet after the finish annealing to obtain a non-oriented electrical steel sheet enhancing a crystal grain growth properties in the stress relief annealing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Hiroaki Tokyo, JP 57 1302
Nakanishi, Tadashi Tokyo, JP 27 174
Oda, Yoshihiko Tokyo, JP 73 311
Okubo, Tomoyuki Tokyo, JP 60 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00