Systems and assemblies for filling and coiling barrier tubes and associated methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10807742
APP PUB NO 20180065763A1
SERIAL NO

15697555

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertically oriented barrier filling assembly for filling barrier tubing with a filling material and coiling filled barriers is disclosed. The barrier filling assembly includes a barrier filling device positioned above a barrier receiving device. The barrier filling device includes a coiler hopper that funnels the filling material to a barrel. An auger situated in the barrel includes a shaft and a fighting, with rotation of the auger feeding the filling material to empty barrier tubing attached to the barrel. Filled barriers are coiled on a vertically adjustable floor of the barrier receiving device as the barrier tubing is filled by moving the coiler hopper and/or the barrel in an orbital path. A system for filling and coiling barriers includes a supply hopper, the assembly, a processing station, and one or more conveyors, the system having a process flow from the storage hopper to the assembly to the processing station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ULTERIOR PRODUCTS LLC5766 REDSAND DR HILLIARD OH 43026

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nienberg, Kurt Hillard, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00