Modular size multi-megawatt silicon carbide-based medium voltage conversion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10130016
APP PUB NO 20180064001A1
SERIAL NO

15686508

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a power cell module includes: a high frequency line converter (HFLC) to receive a phase of input power from a utility source, the HFLC including a first silicon carbide (SiC) stage and a second SiC stage; a transformer having a primary coil coupled to the HFLC and a secondary coil coupled to a high frequency motor converter (HFMC); the HFMC to output a phase of output power to a load, the HFMC including a third SiC stage and a fourth SiC stage; and a two-phase cooling system having conduits that are adapted to provide a flow of cooling media through the HFLC, the transformer and the HFMC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECO-WESTINGHOUSE MOTOR COMPANY5100 NORTH IH-35 ROUND ROCK TX 78681

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edwards, Ryan Round Rock, US 24 658
Guedes-Pinto, Paulo Round Rock, US 49 398
Ledezma, Enrique Austin, US 21 587
Palle, Bhaskara Round Rock, US 6 33
Pipho, Randall Leander, US 11 228
Skorcz, Alex Cedar Park, US 19 569

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00