Fuel cell module with hydrodesulfurizer and preheating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10770741
APP PUB NO 20180062191A1
SERIAL NO

15628783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell module according to the present embodiment includes a hydrodesulfurizer, a cell stack, an exhaust gas channel portion, and an air-preheating channel portion. The hydrodesulfurizer is configured to desulfurize fuel gas using a hydrodesulfurization catalyst. A reformer is configured to generate a hydrogen-containing gas. The cell stack is constituted by stacking a plurality of fuel cells and is configured to generate electric power. The exhaust gas channel portion is configured to discharge the hydrogen-containing gas, and discharge exhaust gas that is generated by the combustion of the oxygen-containing gas. The air-preheating channel portion is an air-preheating channel portion that is disposed so as to be adjacent to the exhaust gas channel portion and that is configured to preheat the oxygen-containing gas through heat exchange with the exhaust gas channel portion. The air-preheating channel portion is disposed between the hydrodesulfurizer and the cell stack.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 1050023 ?1050023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuno, Takeshi Yokohama, JP 17 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00