Touch screen and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10691236
APP PUB NO 20180059835A1
SERIAL NO

15535507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A touch screen and a manufacturing method thereof are provided. The touch screen includes a substrate; and an enhancement layer provided on a surface of the substrate. The enhancement layer is configured to improve strength of the substrate. The method of manufacturing the touch screen includes forming an enhancement layer on a surface of the substrate. The enhancement layer is configured to improve strength of the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
HEFEI XINSHENG OPTOELECTRONICS TECHNOLOGY CO LTD230011 NO 668 LONGZIHU ROAD XINZHAN DISTRICT HEFEI CITY ANHUI PROVINCE HEFEI CITY ANHUI PROVINCE 230011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Xianlin Beijing, CN 21 35
Hu, Ming Beijing, CN 311 1411
Kuo, Tsung Chieh Beijing, CN 30 82
Pang, Cong Beijing, CN 1 0
Shi, Wenjie Beijing, CN 21 30
Xie, Taofeng Beijing, CN 79 147
Xu, Zhanqi Beijing, CN 17 37
Zheng, Ting Bejing, CN 25 128
Zou, Fuwei Beijing, CN 10 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00