Imaging lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10641991
SERIAL NO

15681481

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An imaging lens includes a first lens having positive refractive power; a second lens having negative refractive power; a third lens having positive refractive power; a fourth lens having positive refractive power; a fifth lens; and a sixth lens having negative refractive power, arranged in this order from an object side to an image plane side. The second lens is formed in a shape so that surfaces on the both sides have positive curvature radii. The sixth lens is formed in a shape so that surfaces on the both sides have negative curvature radii. The fourth lens is arranged to be away from the fifth lens by a specific distance on an optical axis, and the imaging lens has a specific angle of view so that specific conditional expressions are satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO VISIONARY OPTICS CO LTD7F MJ BLDG 1-7-4 MINATO CHUO-KU TOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukaya, Hisao Tochigi, JP 90 607
Hirano, Hitoshi Nagano, JP 264 2221
Kubota, Kenichi Nagano, JP 193 1554
Kubota, Yoji Nagano, JP 174 1387

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00