Speed change device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10663011
APP PUB NO 20180058511A1
SERIAL NO

15557282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A speed change device where the plurality of oil holes have a plurality of first oil holes that are closest to the piston in the axial direction and that are disposed side by side in a circumferential direction, and a plurality of different oil holes that are farther from the piston than the plurality of first oil holes in the axial direction, the plurality of oil holes enabling the working oil to be supplied to spaces between the plurality of inner friction plates and the outer friction plates; and a number of the plurality of different oil holes is smaller than a number of the plurality of first oil holes, the plurality of different oil holes being disposed side by side in the circumferential direction at a position that is farther from the piston than the plurality of first oil holes in the axial direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISIN AW CO LTDAICHI AICHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hattori, Nakatsune Chiryu, JP 4 13
Torii, Takeshi Chiryu, JP 78 305

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00