Controllable multi-spool gas turbine plant with independent generator speed control and hollow turbine-compressor separator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10458269
APP PUB NO 20180058242A1
SERIAL NO

15561087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns land-based gas turbine plants with a multi-spool gas turbine arrangement for generating electrical power to supply a load (200). The invention comprises at least three spools (10a-10c). Each of the at least three spools (10a-10c) comprises a shaft (11a-11c), a compressor (C1-C3) and a turbine (T1-T3). Each one of the shafts (11a-11c) of the at least three spools (10a-10c) are independently rotatable with respect to each other. The invention further comprises electrical generators (G1-G3) mounted on each of the shafts (11a-11c) of the at least three spools (10a-10c), the output power of the generators being independently controllable and at least 60 percent of a total output power supplied to said load (200) in a form of electrical and rotational power is generated by the at least three generators (G1-G3) in the form of electrical energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AURELIA TURBINES OY15140 LAHTI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Backman, Jari Lappeenranta, FI 4 81
Honkatukia, Juha Lappeenranta, FI 5 79
Jaatinen-Värri, Ahti Lappeenranta, FI 3 74
Malkamäki, Matti Berlin, DE 3 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00