METHODS FOR RECLAIMING PRODUCED WATER
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Aug 16, 2016
filing date -
Aug 16, 2016
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A method for treating produced water from a fraccing source is disclosed. The method first mixes nitrogen and produced water and feeds the mixture to a forward osmosis unit containing a semi-permeable membrane; carbon dioxide gas is then fed to the forward osmosis unit, therein creating a pressurized nitrogen side and a pressurized carbon dioxide side of the forward osmosis unit; concentrated produced water is recovered from the pressurized nitrogen side of the forward osmosis unit and fresh water is recovered from the pressurized carbon dioxide side of the forward osmosis unit.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LINDE AKTIENGESELLSCHAFT | KLOSTERHOFSTR 1 MUNCHEN 80331 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Aslam, Naveed | Houston, US | 28 | 49 |
# of filed Patents : 28 Total Citations : 49 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- C02F Class
- 0 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 22, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 22, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
