Fuel cell stack presenting reinforced structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10784523
APP PUB NO 20180048000A1
SERIAL NO

15556896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bipolar plate (20) for making a proton-exchange membrane fuel cell stack, said bipolar plate (20) being made up of metal sheets that are shaped and assembled together in such a manner as to define primary fluid-flow channels (24) and secondary fluid-flow channels (25) that are arranged in alternation, said primary channels (24) being formed between said assembled-together sheets; the bipolar plate (20) being characterized in that it includes mechanical reinforcement (35) made out of metal material arranged in a reinforcing duct (30) of the bipolar plate (20), said metal reinforcement (35) being configured in such a manner as to oppose a compression force applied to the bipolar plate (20), said bipolar plate (20) further including a source of electricity adapted to feed electric current to the mechanical reinforcement (35) and thereby give off heat by the Joule effect.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN POWER UNITSCHEMIN DU PONT DE RUPE TOULOUSE 31200

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boudjemaa, Fabien Garches, FR 10 13
Horde, Théophile Suresnes, FR 11 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00