Vitreous silica crucible and evaluation method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024784
APP PUB NO 20180045639A1
SERIAL NO

15783969

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vitreous silica crucible used to pull up silicon single crystal includes: a cylindrical straight body portion, a corner portion formed at a lower end of the straight body portion, and a bottom portion connected with the straight body portion via the corner portion, wherein the vitreous silica crucible further comprises: an opaque outer layer enclosing bubbles therein; and a transparent inner layer from which bubbles are removed, wherein the residual distortion's distribution obtained by measuring the silica glass's inner surface in a non-destructed state has an optical path difference which is 130 nm or less, which residual distortion's distribution is measured using a distortion-measuring apparatus which converts a linearly polarized light into circularly polarized light and then irradiates the crucible's wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMCO CORPORATION2-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8634

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitahara, Eriko Akita, JP 20 35
Kitahara, Ken Akita, JP 29 92
Sato, Tadahiro Akita, JP 38 214
Sudo, Toshiaki Akita, JP 56 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00