Magnetic pulse actuation arrangement for downhole tools and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10801283
APP PUB NO 20180045006A1
SERIAL NO

15674290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement for accelerating a workpiece including a system inductor configured to be supplied a current, a workpiece positioned magnetically proximate to the system inductor, a workpiece inductor associated with the workpiece and configured to magnetically interact with the system inductor. A method for moving a workpiece in a magnetic pressure arrangement comprising increasing inductance of a workpiece subsystem of the arrangement by disposing a workpiece inductor at the workpiece. A method for moving a workpiece in a magnetic pressure system comprising tuning one or more of a resistor, capacitor or inductor of the system to adjust a phase angle of a magnetic pressure produced in the system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES HOLDINGS LLC17021 ALDINE WESTFIELD ROAD HOUSTON TX 77073

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ewing, Daniel Katy, US 28 33
Hern, Christopher Ryan Porter, US 8 15
Prieto, Carlos Katy, US 11 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00