Construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10161107
APP PUB NO 20180044886A1
SERIAL NO

15554871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A housing case (16) is provided on a revolving frame (5) at a position on a front side from a fuel tank (12). The housing case (16) is constituted by including a case-fixing bracket (17) having a left leg part (18), a right leg part (19), and amounting platform (20) across a reducing agent tank (14), a lower accommodating case (21) arranged by surrounding the case-fixing bracket (17), and an upper accommodating case (23) located on an upper side of the lower accommodating case (21). Atop surface part (21E) of the lower accommodating case (21) and a lower surface (23B) of the upper accommodating case (23) are connected to the mounting platform (20) of the case-fixing bracket (17). As a result, the lower accommodating case (21) and the upper accommodating case (23) can be firmly mounted on the revolving frame (5) through the case-fixing bracket (17).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 110-0015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Namai, Yoshio Ibaraki, JP 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00