Machinable and chemically toughenable fluorine glass-ceramic

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10766807
APP PUB NO 20180044225A1
SERIAL NO

15688258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a kind of machinable glass ceramic which can be chemically toughened. The machinable and chemically toughenable glass ceramic, which comprises, as represented by weight percentage based on the following compositions, 25-75 wt % of SiO2, 6-30 wt % of Al2O3, 0.1-30 wt % of Na2O, 0-15 wt % of K2O, 0-30 wt % of B2O3, 4-35 wt % of MgO, 0-4 wt % of CaO, 1-20 wt % of F, 0-10 wt % of ZrO2, 0.1-10 wt % of P2O5, 0-1 wt % of CeO2 and 0-1 wt % of SnO2, wherein P2O5+Na2O>3 wt %, and Al2O3+Na2O+P2O5>17 wt %. Mica crystalline phase can be formed in the glass ceramic and the glass ceramic can be chemically toughened by one step, two steps or multiple steps with depth of K-ion layer of at least 15 μm and surface compress stress of at least 300 MPa. The profile on depth of the ion exchange layer follows the complementary error function. Hardness can be improved by at least 20% after chemical toughening. The dimension deviation ratio is less than 0.06% by ion-exchanging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHOTT GLASS TECHNOLOGIES (SUZHOU) CO LTDNO 79 HUOJU ROAD SCIENCE & TECH INDUSTRIAL PARK SUZHOU NEW DISTRICT SUZHOU JIANGSU 215009

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Huiyan Suzhou, CN 8 23
Ping, Wenliang Suzhou, CN 2 10
Wang, Chong Suzhou, CN 175 1319
Xue, Junming Suzhou, CN 11 26
Zimmer, Jose Losheim am See, DE 44 1051

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00