Loading Car With Separately Activatable Discharge Devices
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Jun 5, 2015
filing date -
Jul 1, 2014
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A loading car for picking up, transporting onward and discharging bulk material has a car frame supported on on-track undercarriages and a distributing conveyor belt extending in a longitudinal direction of the car, for transporting the bulk material to discharge devices. The distributing conveyor belt is constructed to be displaceable in the longitudinal direction of the car for selectively charging the discharge devices. A first discharge device is constructed as a chute disposed above a track. A second as well as a third discharge device are constructed in each case as a conveyor belt pivotable about a vertical axis and each has a receiving end positioned in the region of the axes.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN M B H | JOHANNESGASSE 3 WIEN A-1010 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
HOETZENDORFER, PATRICK | ENGERWITZDORF, AT | 7 | 3 |
# of filed Patents : 7 Total Citations : 3 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- B65G Class
- 34.36 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 15, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 15, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
