Modular, self-contained, mobile clean room

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10654036
APP PUB NO 20180043347A1
SERIAL NO

15727002

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Biosafety units, methods of making and sealing the same are disclosed herein. The present invention includes a unitary structure able to be validated for pharmaceutical manufacturing comprising: at least one controlled air, sealable, sterilizable cleanroom; a mechanical system room adjacent to and separate from the cleanroom comprising: one or more air handling units that provide conditioned air to the cleanroom; and one or more power busses that provide power to electrical outlets in the cleanroom from two sources, wherein the at least two power supplies are connectable to one or more external electrical power sources; an integrated fire suppression system integral to the cleanroom; and one or more corridor connectors, wherein a corridor can be attached at the corridor connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
G-CON MANUFACTURING INC6161 IMPERIAL LOOP COLLEGE STATION TX 77845

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arledge, Troy Rockdale, US 6 137
Holtz, R Barry Houston, US 24 450
Maples, Phillip B Pilot Point, US 22 161
Shanahan, David M Dallas, US 13 180

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00