Control device for a phacoemulsification system and phacoemulsification system comprising such a control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10932949
APP PUB NO 20180042770A1
SERIAL NO

15793492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control apparatus for a phacoemulsification system is disclosed. The control apparatus is configured to supply electrical energy to an actuator for a phaco needle during a plurality of time intervals, wherein the time intervals includes a first time interval, in which electrical energy for pulses with a constant maximum amplitude is supplied, a second time interval following the first time interval, wherein electrical energy with a value equal to zero is supplied, and a third time interval following the second time interval, wherein the third time interval has a first time duration in which electrical energy for pulses which have a lower constant amplitude than the maximum amplitude during the first time interval is supplied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARL ZEISS MEDITEC AGANALYTIK JENA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fanenbruck, Martin Oberkochen, DE 9 50
Kohlhammer, Susanne Blaustein, DE 13 6
Langheinrich, Peter Oberkochen, DE 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00