Vehicle test system, recording medium recorded with vehicle test system program, vehicle test method, and running resistance setting apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10885726
APP PUB NO 20180040176A1
SERIAL NO

15623771

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to prevent the occurrence of a user's erroneous operation as well as preventing an inappropriate road load from being set in a dynamometer, a vehicle test system that tests the performance of a vehicle or a part of the vehicle is adapted to include a dynamometer adapted to provide a load to the vehicle or the part of the vehicle, an actual running data acquisition part adapted to acquire actual running data from an actual running vehicle running on a road, a road load calculation part adapted to, on the basis of the actual running data, calculate a road load used to test the performance of the vehicle or the part of the vehicle, a road load data setting part adapted to set the road load in the dynamometer, and an output part adapted to, before the setting in the dynamometer, viewably output the road load to a user.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORIBA LTD2 MIYANOHIGASHICHO KISSHOIN MINAMI-KU KYOTO-SHI KYOTO 6018510 ?6018510

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adachi, Masayuki Kyoto, JP 24 178
Ogawa, Yasuhiro Kyoto, JP 68 837

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00