Shaft support structure, laser beam projecting unit and surveying instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10634497
APP PUB NO 20180038690A1
SERIAL NO

15658779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a laser beam projecting unit in which a hollow rotation shaft is provided on a fixed portion via one bearing, a rotor of an axial gap-type motor is provided on one end portion of the rotation shaft, a stator of the axial gap-type motor is provided on the fixed portion so as to confront the rotor, an attracting force between the rotor and the stator acts on the bearing as a pressurization, an angle detector for detecting a rotation angle of the rotation shaft is provided on the other end portion of the rotation shaft, a deflection optical component is provided inside the rotation shaft, and a laser beam is projected through the deflection optical component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPCON CORPORATION75-1 HASUNUMA-CHO ITABASHI-KU TOKYO 1748580

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Takahiro Tokyo-to, JP 206 1593
Matsumoto, Hideyuki Tokyo-to, JP 87 564
Ohtomo, Fumio Saitama, JP 270 5478
Osaragi, Kazuki Tokyo-to, JP 50 1284

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00